|
Project
|
|
Description of Work
|
South Jordan 5MG
Water Tank
11800 South, 6500 West South Jordan, UT
|
Hansen, Allen and Luce
6771 South, 900 East
Murray, UT 84047
Phone: 801-566-5599
Marvin Allen
|
Construction of a 5 MG buried concrete reservoir with 26 foot high walls, along with a buried valve vault and associated yard piping. |
Episcopalian Diocesan Center
75 South, 200 East
Salt Lake City, UT 84111 |
Culp Construction Company
2320 South Main Street
Salt Lake City, UT 84115
801-486-2064 |
Footing, foundation and retaining walls, as well as decorative flatwork concrete, and equipment pads. Challenges include a very tight working area and coordination with other subcontractors, in winter working conditions. |
Union Heights
Office Tower
7740 South, 1300 East
Sandy, Utah 84094 |
Raddon Brothers Development
1111 East Draper Parkway
Suite 101
Draper, UT 84020
801-556-1553
Bud Call, Ron Raddon |
Concrete construction of a six story office building including placing of reinforcing steel and concrete for footing, foundation and concrete decking. Central mat footing included a single pour of 580 cubic yards of concrete over 4 feet thick. |
Jordan Valley Water
Conservancy District
Four Wells Pump Stations Project |
Jordan Valley Water Conservancy District
8215 South, 1300 West
West Jordan, UT 84088
Contact: Dave Norman
(801) 565-4300
Stantec Consultants
3995 South, 700 East
Salt Lake City, UT 84107
Contact: Jared Oldroyd
(801) 261-0090
|
Project involved the construction of four deep well turbine pump houses turnkey, including connecting to existing service lines, installation of chemical storage and feed systems, with water system surge protection and blow-off systems. Challenges included the coordination of men, equipment and materials at four independent sites spread throughout the valley in residential areas, as well as traffic control during hot tapping tie-ins to main water distribution lines during off peak times, with minimal traffic and neighborhood disruption. |
Battle Creek 3MG Irrigation Tank
2nd South, 1600 East
Pleasant Grove, Utah |
J-U-B Engineers
240 West Center Street
Suite 200
Orem, Utah 84057 |
Mass excavation and construction of a 3 million gallon open top irrigation tank including associated site and street piping tie-ins. Hillside construction required mass excavation of over 33,000 cubic yards of native material. Tank floor was constructed in a single pour of over 600 cubic yards. |
IPS-Cephalon
4745 Wiley Post Way
Salt Lake City, Utah |
IPS
2001 Joshua Road
Lafayette Hill, PA 19444
(610) 828-4090
Greg Call |
Project consisted of all footings, foundation, flatwork and mechanical pads for a 185,000 sq.ft. pharmaceutical manufacturing facility. Project was successfully completed using the design build process and required complex coordination and cooperation and was successfully completed on time and on budget. |